
Full bathroom renovations
Down to the studs: plumbing, waterproofing, tile, vanity, toilet, glass and lighting.
Full bathroom renovations, walk-in showers, basement bathrooms and ensuites, with the plumbing permit handled for you.
Rough budgets before HST. The real number comes after a site visit and your selections. Moving plumbing costs more than keeping it where it is. See the full cost guide.

A basement bathroom is one of the most useful things to add. The big question is the drain: if the main sewer line sits above the basement floor, the toilet needs a pump.
A site visit tells you which one your house has.
Read the basement bathroom guideOften, yes. The Town of Orangeville lists any installation or alteration of a plumbing system as permit work. Read the full permit guide.
New fixtures, moved fixtures, a new shower or a new bathroom all change the plumbing system.
Moving walls or cutting joists for a drain is permit work too.
By email or in person at Town Hall, 87 Broadway. The Town prefers digital PDFs.
10 business days for a residential application under the Building Code, once it's complete.
The plumbing rough-in gets inspected before the walls close. Book 24 hours ahead.
Applications made from April 1, 2025 follow the 2024 Ontario Building Code.
Bathroom renovations in Orangeville and nearby Dufferin County.
The town and its neighbourhoods off Broadway.
Township east and north of Orangeville.
Township northwest of Orangeville.
Town to the north on Highway 10.
If you install or change the plumbing, yes. The Town lists any installation or alteration of a plumbing system as permit work.
Most run $10,000 to $30,000+ before HST. A basic refresh starts around $10,000 to $15,000, and high-end or layout changes run $35,000 to $70,000+.
About 2 to 3 weeks of work, plus 1 to 2 more if the layout changes.
The Building Code gives 10 business days for a complete residential application.
Yes. If it's your only bathroom, plan for a few days without a shower during the build.
The plumbing rough-in before the walls close, and a final. The Town lists the required inspections on the permit.
Usually. If the main drain is above the floor, the toilet needs a pump or an upflush system.
A site visit shows what the space can hold and what the plumbing allows.